Frenchman Lake Road Bridges Project

Construction staking for three soffit bridges and roadway approaches.

 
Reno/Tahoe International Airport Runway 7 25 Restoration Phase B

Construction surveying to support taxiway restoration project including rough grading, slope staking for infield areas, storm drain layout, grade stakes for aggregate course, grade stakes for ATPB course, pour lane layout, saw cuts at join locations, electrical light layout, stripping layout, signage layout and quantity surveys and computations.

 
Boulder City Library

Construction staking and survey support for the construction of the new library building, parking lot, sewer connection, storm drain facilities, water line and lighting.

 
State Route 806 Bridge Over the Humboldt River, Battle Mtn., Nevada

Construction staking to support the bridge and roadway approach construction.

 
High Desert State Prison, Susanville, California

This on-call services agreement included construction surveying for horizontal and vertical control, slope staking, as-built verification surveys and record drawing preparation, rough grade staking, finish grade staking, building pad layout, casting pad layout, post construction location and as-built drawings and survey monument perpetuation.

 
U.S. 395 and McCarran Boulevard Interchange

Construction surveying for new bridge, approaches and interchange ramps.

 
Peppermill East Expansion

Construction surveying for new tower and elevator and on-site improvements.

 
345kv Transmission Line - Alturas, California to Reno, Nevada

Environmental and construction surveying on 95 miles of the proposed power line over rugged terrain with limited access. Existing control was verified with static GPS observations. Tower locations were stakesd using real-time kinematic GPS for environmental review. Final construction was completed with a combination of GPS and conventional surveying methods.

 
Atlantis Casino Phase IV Expansion

Construction surveying for new tower and elevator and on-site improvements.