| Frenchman
Lake Road Bridges Project |
Construction
staking for three soffit bridges
and roadway approaches.
|
| |
| Reno/Tahoe
International Airport Runway 7 25 Restoration
Phase B |
Construction surveying to support
taxiway restoration project including
rough grading, slope staking for
infield areas, storm drain layout,
grade stakes for aggregate course,
grade stakes for ATPB course, pour
lane layout, saw cuts at join locations,
electrical light layout, stripping
layout, signage layout and quantity
surveys and computations.
|
| |
| Boulder
City Library |
Construction
staking and survey support for the
construction of the new library
building, parking lot, sewer connection,
storm drain facilities, water line
and lighting.
|
| |
| State
Route 806 Bridge Over the Humboldt River,
Battle Mtn., Nevada |
Construction
staking to support the bridge and
roadway approach construction.
|
| |
| High
Desert State Prison, Susanville, California
|
This
on-call services agreement included
construction surveying for horizontal
and vertical control, slope staking,
as-built verification surveys and
record drawing preparation, rough
grade staking, finish grade staking,
building pad layout, casting pad
layout, post construction location
and as-built drawings and survey
monument perpetuation.
|
| |
| U.S.
395 and McCarran Boulevard Interchange
|
Construction
surveying for new bridge, approaches
and interchange ramps.
|
| |
| Peppermill
East Expansion |
Construction
surveying for new tower and elevator
and on-site improvements.
|
| |
| 345kv
Transmission Line - Alturas, California
to Reno, Nevada |
Environmental
and construction surveying on 95
miles of the proposed power line
over rugged terrain with limited
access. Existing control was verified
with static GPS observations. Tower
locations were stakesd using real-time
kinematic GPS for environmental
review. Final construction was completed
with a combination of GPS and conventional
surveying methods.
|
| |
| Atlantis
Casino Phase IV Expansion |
Construction
surveying for new tower and elevator
and on-site improvements.
|
| |