| 120KV
Transmission Line - Tracy Plant to Eagle
Substation |
Preparation
of 1" = 2000' scale land status
maps for preliminary route constraint
study. Mapping included research
to develop land status and ownership
within the five mile wide study
corridor and location of existing
transmission lines. Binders were
supplied with Assessor's Maps and
ownership roles for the three county
project.
|
| |
|
COSO Geothermal Project Historical
Data Conversions to Common Datum
|
The
project involved the analysis and
adjustment of subsidence monitoring
surveys from 2000, 1998, 1996, 1995,
1994, 1993, 1992 and 1988 including
1988 and 1987 data sets from Los
Angeles Department of Water and
Power to North American Datum of
1983 Ellipsoid Heights for comparative
studies by the U.S. Navy.
|
| |
| Modoc
County Surveyor Year 2000 |
Conduct
reviews of record plats prior to
recordation and serve as surveying
consultant to county project.
|
| |
| Expert
Witness Services |
Conducted
expert witness consulting services
including investigation, analysis
and conclusions relating to topographic
mapping, control surveys and volume
quantity studies.
|
| |
| Modoc
County Surveyor Year 1998 and 1999 |
Conduct
reviews of record plats prior to
recordation and serve as surveying
consultant to county project.
|