| Truckee
River Cross Sections |
GPS
collect and monument ninety (90)
cross sections of the Truckee River
between the Sewage Treatment Facility
located in Sparks, Nevada to Wadsworth,
Nevada approximately twenty miles
in length for the Truckee River
Hydrologic Study.
|
| |
| US
95 from Interstate 15 to Washington
Boulevard |
Task
1 of this project consisted of route
alignment control survey, best fit
centerline resolution, establishment
of adjacent property boundaries
and existing NDOT right-of-way for
the 9 kilometer project including
the establishment of best fit centerlines
and right-of-way of five interchanges
and three overpasses for final design
right-of-way. Task 2 of the project
included preparation of Final R/W
Plans and right-of-way engineering
for the Valley View Boulevard to
Decatur Boulevard section of the
project, including fifty (50) acquisition
parcels. Task 3 of the project included
preparation of 50% R/W Plans and
right-of-way engineering for the
Martin Luther King Boulevard to
Valley View Boulevard section of
the project including seventy-five
(75) full parcel acquisitions.
|
| |
| Reno/Stead
Airport Runway Design Surveys |
Provide
design surveys for west end E-W
Runway area and east end E-W Runway
for about 90 acres. The deliverables
included topographic mapping at
1"=50' scale with a 1 foot contour
interval.
|
| |
| Spaghetti
Bowl I80/I580/US395 & Rock Boulevard |
This
project consisted of aerial ground
control survey, 1:240 scale, 0.5
meter contour interval topographic
mapping and planimetric mapping,
construction monumentation and control
survey, alignment survey and right-of-way
establishment for 15 kilometers
of I80, I580, US 395 and Rock Boulevard,
utility location surveys, as-built
design surveys including 20 meter
interval cross sections on paved
surfaces and 10 meter cross sections
over structures, bridge detail surveys
and utility potholing.
|
| |
| ALTA/ACSM
Land Title Surveys |
Prepare
seventeen ALTA Land Title Surveys
including boundary, easements and
encumbrances, on-site improvements,
adjacent off-site improvements with
a three week delivery schedule.
|
| |
| US
Highway 50 |
This
project consisted of large scale
mapping (0.3 meter accuracy) to
Federal Standards of 15 miles of
existing highway and drainage facilities
for erosion control master planning
and improvement design. 187 photo
control points were set and controlled
by GPS fast static surveys. All
utilities were located as well as
drainage features and structures.
The existing right-of-way established
from alignment retracement surveys,
right-of-way mapping for new parcel
acquisitions.
|
| |
| Men's
Prison #7 |
GPS
control surveys; topo mapping; and
boundary and cadastral surveys covering
three sections.
|
| |
| Patrick
Interchange to Truckee River, Interstate
80 R/W |
Survey
and photo control by GPS methods,
riparian boundaries, hydrographic
surveys, right-of-way surveys, ownership
and easement research, legal descriptions
and right-of-way mapping to N.D.O.T.
and federal standards and construction
surveying on bridge.
|
| |
| S.R.
28 and Highway 50 |
Lake
Tahoe Basin Erosion Control Planning
and Design Survey and photo control
by GPS methods, large scale mapping
to N.D.O.T. "Special Instructions
for Surveying or Mapping Consultants",
best fit centerline surveying and
calculations, cadastral surveys,
right-of-way calculations and resolution,
right-of-way mapping to N.D.O.T.'s
standards, on over 20 miles of highways.
|
| |
| Interstate
80 - Fernley to Nightingale |
GPS
control survey and HARN densification,
set construction control FENO monuments,
locate existing right-of-way monuments,
calculate and draft best fit centerline,
strict tolerance vertical cross-sections
and mapping of 26 miles of Interstate
80.
|